← Joseph Howell
Case study · Multi-site packaging converter

Production gross profit from $32K to $1M+ in four years

An import company was losing money trying to move into manufacturing. I brought the manufacturing expertise to take them from a crawl to up and running.

4 yearsoperations manager, then VP over all three sites
~50 people, 3 siteslaminating, tubing, sewing
Woven poly bagsseed and feed, on paper or BOPP film
Try the scheduler ↓
The record

What changed

MeasureBeforeAfterNotes
Production gross profit$32K→$1M+$32K my first year, up from a loss. $1M+ by year four
Monthly output500K bags→1M+ bagsThe machines could do 2M
Scrap rate13%+→under 8%About $100K out of COGS
Food grade certificationnot achieved→ISO 22000 + 9001In about 6 months, after years of a ~$60K/yr consultant
The bankpressure→financed growthFunded a domestic joint venture
Sales into the plantavoided→growingSalespeople chose our plant over importing
Try it yourself

What jumping the line really costs

Here's a week of bag jobs, staged by size. Rush any job to the front, the way a salesperson would, and watch the setups and scrap stack up. Moving one job doesn't just cost its own setup. You have to change back afterward.

Setups
Line hours lost
Bags scrapped
Scrap rate
50 lb feed 25 lb seed 40 lb feed Setup (about 4 hours)

    Illustrative numbers from woven poly converting: 10 jobs of 30,000 bags. A job runs at about 5% scrap. A job run right after a setup scraps about 20%, because you run good material through the laminator and tuber to get it set up. Each setup takes about 4 hours.

    The situation

    Good at importing. New to manufacturing.

    The company was a successful import-export business. It warehoused bags and drop-shipped containers to customers.

    The president wanted to make bags too. The company invested in a plant and new equipment, and the bank wanted to see it turn a profit.

    But they weren't manufacturers. They ran the plant like a job shop:

    • One crew followed each job through laminating, tubing and sewing.
    • Machines ran, then sat idle while the crew moved on.
    • Every job was scrap heavy and labor heavy.

    That's why the plant was losing money.

    The fix

    Production gets the schedule

    “Our company is going to be known from the before Joseph Howell and the after Joseph Howell for the rest of its existence.”
    Company president

    Our production manager was a savant with the card board. He just needed people to stop moving the cards.

    So I banned salespeople from going back to the floor unannounced. Then everyone came to a production meeting on Monday, Wednesday and Friday.

    Sales could still haggle over priorities, but in front of the other salespeople, and with a price attached.

    “We can move your job up. It's going to cost this much more to run.”

    Once they could see the cost, most let us stage jobs by size. Their jobs started making money, and trust came fast after that.

    The bottleneck

    Keep the sewing lines running

    The laminator could outrun the tubers, and the tubers could outrun the sewing lines. So the rule was simple: the sewing lines never stop.

    • Dedicated crews on each machine
    • More sewing lines
    • One laminator running, the second kept as backup

    Machines that keep running make better product, too. They need a steady running tension, and every stop costs scrap.

    Once salespeople believed they could sell into our plant and make money, output went from 500,000 to over a million bags a month.

    Food grade

    Certified in six months

    They had paid a consultant about $60,000 a year to get food grade certified. It never happened, because the floor never bought in.

    I had never done food grade before. I didn't give them a choice, and I got them excited about it. We were certified to ISO 22000 and ISO 9001 in about six months, and I became internal audit and HACCP certified along the way.

    That opened sales to customers who needed food grade packaging. It was part of what got us to $1 million.

    The bank noticed. It went from pressuring us to financing a domestic joint venture with one of our vendors.

    What I learned

    Somebody has to guard the schedule

    We never got the sewing lines to 24/7. We ran short second shifts when the bottleneck got big, and we were headed that way.

    I don't know if they got there after I left. The temptation for sales to run production is strong. Without a gatekeeper, it's hard to keep them out.

    Machines running below capacity?

    Start with a 20-minute call.

    Tell me what's stuck. I'll tell you plainly whether I can help, and if I'm not the right fit, I'll say so.

    Book a 20-minute call

    Or email joseph@josephahowell.com